1
a) Describe
possible faults which may be found
during a dry dock inspection of the following and the remedial action taken.
- Hull indentations
- Anchor and chain
- sea chest
hull
indentations-
the primary factors to be considered in
assessing the effect of indents are as follows
- measure the area and depth od the indentation and record in shell expansion drawing check Whether internal structural members in way.
- Whether internals in way are significantly affected i.e. tripped or adrift from bottom plating. Smooth sccttered indent with small depth with the internals remain intact can be left after the recording. If the depath is large renewal of the section with the similar plate having minimum 300x300mm should be done any damaged or detached internals must be renewed.
Anchor and chain
Identification
of repairs are done after laying in dock bottom. Washing ,removal of any rust makes it easier for the inspection and caliberation
If
the wear down is exceeded the recommended value those chain length are to be
renewed with similar chain lengths with classification certificates .
Any
missing lugs are to be replaced and loose lugs are to be re welded joining shakeles securing arrangement and the
pin and their end sealing arrangement with lead is checked
Anchor
is checked for worn out fluke pin worn out shank pin and hole weight measurement is requirement in some classification societies
A
Steam outlet pipe section inside the sea
chest corroded and wasted
B. Pipe connecting the sea chests are thinned down or erroded
(stub pieces are thinned down )
C. Usually vent pipe is find chocked due to the
small pipe diameter the pipe get chocked
D. In high sea sucion upper area
corrosion due to the accumulated air in the sea chest may find if the vent holes are not provided on the top
E. Sea chest top plates from the engine room
side may get thin down due to the water leakages of glands and accumulated
water.
F. Fouling
G. Mgps sytem not funtioning
lll locking arrangements of the gratings wasted anodes
thhic thickness measurement of sea chest plats and stub pieces should be done overhauling all opening mounted on the sea chest is done steam discharge line should be check anodes fitted are renewed. securing arrangements of the gratings are checked and ensure anodes are uncovered before fitting back the gratings.